Tonight I headed down to the house again to install an extra couple of bags of glasswool insulation. This time I took down our camping light, which lost power half way into my job. It's very dark out there and I had to do the remainder with a torch. :) This batch of insulation was added to the main bedroom and WIR area. Now all of the main rooms are now done which will help with heating and cooling the house dramatically. Gyprock is scheduled to start tomorrow with bricking on Wednesday.

The white sand has also been delivered today in readiness for the brickwork. Damp proof membrane and galintel's were also now on site.

Also met our neighbour tonight on lot 1024 who now has a frame. Exciting for them also!